Alta Depot - Salt Lake City, UT
              288 Units

Bids/Proposals Due:  Changed to January 8th 2021 @ 2:00 pm

***Please Note***  These are the Design Development Drawings and are not the final 100% complete set of plans.  These will not be used for Contracts/Construction.

Please submit any questions/RFI's to bid@rimrock.us by end of day 12-16-2020 

Contact: bid@rimrock.us 

Updated Finish Schedule posted 12-11-2020
Additional GeoTech Report posted 12-14-2020 also see note #1 on S001 under foundation notes

Addendum #1 posted 12-18-2020
Addendum #2 posted 12-29-2020
RFI Log 12.30.20 with attachments posted 12-30-2020
RFI Log #2 1.5.21 with attachments posted 1-5-2021

 

Document Name Date/Time Uploaded Directory Name
Addendum #1 - 2020.12.18.zip 12/18/2020 3:24:00 PM Alta Depot">Alta Depot
Addendum #2.zip 12/29/2020 4:01:00 PM Alta Depot">Alta Depot
ALTA DEPOT RFI LOG #2 01.05.21 with attachments.pdf 1/5/2021 2:10:00 PM Alta Depot">Alta Depot
ALTA DEPOT RFI LOG 12.30.20 with attachments.pdf 12/30/2020 3:47:00 PM Alta Depot">Alta Depot
ARCHITECTURAL.zip 12/8/2020 8:50:00 AM Alta Depot">Alta Depot
Bid Cover Sheet.pdf 12/8/2020 11:31:00 AM Alta Depot">Alta Depot
CIVIL LANDSCAPE POOL.zip 12/8/2020 10:09:00 AM Alta Depot">Alta Depot
GeoReport-FINAL.zip 12/14/2020 3:45:00 PM Alta Depot">Alta Depot
INTERIOR DESIGN DRAWINGS.zip 12/8/2020 10:09:00 AM Alta Depot">Alta Depot
MEP.zip 12/8/2020 9:12:00 AM Alta Depot">Alta Depot
Rimrock Insurance Requirements.pdf 12/8/2020 11:31:00 AM Alta Depot">Alta Depot
Specs Geotech.zip 12/11/2020 3:35:00 PM Alta Depot">Alta Depot
STRUCTURAL.zip 12/8/2020 8:50:00 AM Alta Depot">Alta Depot